Operation process for pressure gauge calibration, testing, and measurement on the AILEIKE ALKT700 air pressure calibration bench
To ensure the measurement accuracy and metrological reliability of pressure gauges, and to standardize the calibration, testing, and measurement of pressure gauges, this operation procedure is formulated based on metrological specifications. This procedure uses the ALKT700 pressure calibration bench and ALKC400D precision digital pressure gauge as standard instruments, covering full-range testing of positive pressure and vacuum negative pressure. It strictly follows standardized steps such as environmental control, sealed connection, stepwise pressure increase and decrease, and reading the gauge after pressure stabilization by gently tapping the gauge case. It adheres to the operational principles of slow pressure increase and precise reading. At the same time, it clarifies equipment maintenance and periodic calibration requirements to ensure the accuracy of the calibration system itself, avoid operational risks, and provide compliant and reliable data support for pressure measurement in various industrial scenarios.
1. Calibration tool for pressure gauge

The entire verification process must strictly adhere to the current metrological technical specifications, primarily based on JJG52-2013 "General Pressure Gauges, Pressure Vacuum Gauges, and Vacuum Gauges with Elastic Elements". This standard is applicable to the initial verification, subsequent verification, and in-service inspection of general pressure gauges, pressure vacuum gauges, and vacuum gauges with elastic elements, covering locally indicated pressure measuring instruments commonly used in industry.
II. Detailed Explanation of Operational Procedures
(I) Preliminary preparations
1. Environmental requirements
The temperature should be controlled at (20±2)℃, with a relative humidity of ≤85%RH, and there should be no condensation. Ensure that the site is free from vibration, dust, and corrosive gases.
2. Tool connection
• Connect the standard gauge ALKC400D and the verified pressure gauge Y-100BF to the ALKT700 output port seal.
(II) Pressure gauge calibration process
1. Voltage boosting process
First, push the ALKT700 switch valve inward (do not switch under pressure), then rotate the fine adjustment knob counterclockwise to the outside until it reaches the appropriate position, and close the vent valve.
• Apply pressure using a lever, stopping when the pressure reaches around the verification point. Then, use fine adjustment to slowly turn clockwise to reach the verification point of 1 MPa. After the pressure stabilizes and the standard indicated value no longer fluctuates, check the pressure value of the verified pressure gauge. Next, gently tap the side of the verified pressure gauge's casing with your finger (tapping on the glass or hitting hard is strictly prohibited), observe the pointer position, and record the indicated value after the tapping stabilizes. Use the indicated value after tapping as the actual measured verification reading for this pressure point, and calculate the error.
• Then, use the lever to increase the pressure to around the verification point and stop. Use the fine adjustment to slowly turn clockwise to reach the verification point of 2MPa. Once the pressure stabilizes, tap the verified pressure gauge and record the value.
• Adjust the same operation to the verification point of 3MPa, check the pressure value of the verified pressure gauge, tap the verified pressure gauge, and record the indicated value after the tap is stabilized.
Finally, directly use the fine adjustment to slowly turn clockwise to the verification points of 4MPa, 5MPa, and 6MPa. Once the pressure stabilizes, tap the verified pressure gauge and record the values.
2. Decompression process
• First, slowly open the vent valve and reduce the pressure until it stops at the verification point. Close the vent valve and use a micro-adjustment tool to slowly adjust it counterclockwise to 5 MPa at the verification point. Once the pressure stabilizes, tap the pressure gauge being verified and record the value.
• Adjust the same operation to the verification points of 4MPa, 3MPa, 2MPa, and 1MPa, check the pressure values of the verified pressure gauge, tap the verified pressure gauge, and record the indicated value after the tap stabilizes.
3. Pressure relief process
Open the vent valve, gradually release the pressure inside the pipeline until it reaches 0, and then the measurement is complete.
(III) Pressure gauge vacuum calibration process
1. Voltage boosting process
• First, remove the verified gauge for measuring positive pressure and install the verified gauge for measuring negative pressure. Pull out the ALKT700 positive and negative pressure switch valve (do not switch under pressure), then adjust the fine adjustment clockwise to the appropriate position and close the vent valve.
• Apply pressure with a lever until it reaches around the verification point, then use fine adjustment to slowly turn counterclockwise to adjust the pressure to -0.02 MPa of the verification point. Once the pressure stabilizes, tap the verified pressure gauge and record the value.
• Perform the same operation at the verification points of -0.04MPa, -0.06MPa, -0.08MPa, and -0.095MPa, check the pressure values of the verified pressure gauge, tap the verified pressure gauge, and record the indicated value after it stabilizes.
2. Decompression process
• First, slowly open the vent valve and reduce the pressure to around the verification value, then close the vent valve. Use a fine adjustment tool to slowly turn clockwise to reach the verification point of -0.08 MPa. Once the pressure stabilizes, tap the verified pressure gauge and record the value.
• Perform the same operation with the verification points adjusted to -0.06MPa, -0.04MPa, and -0.02MPa, check the pressure values of the verified pressure gauge, tap the verified pressure gauge, and record the indicated value after the tap becomes stable.
3. Pressure relief process
Open the vent valve, gradually release the pressure in the pipeline, and when the pressure is reduced to 0, the measurement is complete.
III. Precautions
Standardized use
• During verification, it is important to ensure that the tolerance of the standard instrument is less than that of the instrument being verified, to ensure the accuracy and reliability of the verification results and comply with metrological specifications.
• Operations should follow standard procedures. The ALKT700 pressure calibration bench should be pressurized and depressurized slowly to avoid pressure shock.
• Increase the pressure to the verification point and record the indicated value after the standard gauge's reading stabilizes. For the verified pressure gauge, gently tap the gauge case after the pressure stabilizes, and take the indicated value after tapping as the accurate reading to ensure accurate recording.
• After the inspection is completed, slowly release the pressure to zero and ensure there is no residual pressure before removing the instrument being inspected.
Maintenance and calibration cycle
• Regularly conduct metrological verification on the Precision digital pressure gauge alkc400D (it is recommended to do so once a year) to ensure that the measurement accuracy meets the standard.
• When the pressure gauge is not in use, the power should be turned off. If it is not used for a long time, it should be charged once every three months.
• If the air pressure table is not used for a long time, it should be depressurized and stored, covered with a cloth cover to prevent dust from entering the instrument.
IV. Conclusion
Carry out pressure gauge calibration, testing, and measurement strictly following this process, verify the indication error and return measurement performance of the inspected gauge, accurately identify potential instrument deviation hazards, and ensure the authenticity and accuracy of pressure monitoring data. During operation, strictly adhere to the standardized requirements of step-by-step pressure increase and decrease, stable indication, and reading by gently tapping the gauge case to avoid pressure shock and human reading errors; at the same time, implement regular verification of standard instruments and daily maintenance requirements for equipment to ensure reliable traceability of measurement values in the calibration system.